SNOOC - Sledge run - Dieni with chair lift or ski touring

Informationen zur Route

Kategorie
Region
Difficulty
Leicht
Länge
Dauer
Aufstieg
Abstieg

Best Time of Year

JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
oct
NOV
dec

Description

Our sledding fun starts in Milez, at the middle station of the ski area. The uppermost section of the descent is specially designed for sledgers (and hikers) and leads along the ski slope. Concentration is called for, as there is a danger of unintentionally going too fast. As soon as we reach the prepared road in Mulinatsch, the gradient is a bit more leisurely, but always in such a way that it "sweeps".After we have passed under the railway line, the toboggan run runs out to the right and the last meters to the chair lift station we walk.From 14 March 2020 no more lifts are in operation (end of season)

Höhenprofil

EXTERNAL_SPLITTING_BEGINEXTERNAL_SPLITTING_END